The Emmitsburg
Pro Enduro
A two-day enduro weekend with a paid Pro/Elite field at the top and amateurs racing the very same stages underneath. It is built to bring a national-level race, and the people who follow it, to Emmitsburg's trails.
What Emmitsburg gets
A pro field changes who shows up. The riders who chase prize money bring sponsors, cameras and a following, and the open field fills in behind them.
Trails on the national map
A Pro/Elite purse draws riders from well beyond the region. Their results, photos and video carry the name Emmitsburg to riders who have never heard of it.
Two nights in town
A two-day format means Saturday night stays: hotels, campgrounds, dinner and breakfast in Emmitsburg instead of a day trip home.
A full weekend crowd
250 to 300 racers, plus the families, teammates, mechanics and spectators who travel with them.
New trails, no contractor
The stages are built by hand by B-Team and community volunteers. Emmitsburg gets a lasting trail network without a six-figure construction bill.
Pro photo and video
Professional photography and video of the event give the town and its trails footage it can use for years.
Local at the core
Packet pickup and racer food run through local businesses, and part of the proceeds goes back to Emmitsburg. Last year The Shed Enduro gave back $8,000, split evenly between the Frederick Watershed and Gambrill.



What we need
A short list from the town. B-Team brings everything else.
From Emmitsburg
- 1Permission to build by handApproval of the stage and climb alignment in the Emmitsburg Watershed, and permission for scheduled volunteer build days using hand tools.
- 2Use for race weekendPermission to run the timed stages across two days, with stages closed to the public during practice and racing.
- 3A staging venue in townSpace for registration, the pits, vendors and the podium, such as Eugene Myers Memorial Park.
- 4Parking and road crossingsHelp coordinating racer parking and safe crossings where riders transfer between stages.
- 5Partnership and promotionHelp connecting with local lodging, restaurants and businesses so visitors spend the weekend in town.
B-Team provides
- →Trail design and build crewsLayout, flagging, tools and organized volunteer build days, plus upkeep after the race.
- →Event productionRegistration, course design and marking, volunteers, setup and cleanup.
- →Medical and communicationsOn-course medical through AMP and radio coverage through the FARC ham radio team.
- →Professional timingStage-by-stage electronic timing and live results.
- →Event insuranceLiability coverage for the event.
- →A give-back to EmmitsburgA share of race proceeds returned to the town, with the amount and recipients agreed in advance.
- →Media and reachProfessional photo and video, plus B-Team's racing community and promotion.
Built by hand
This course does not need heavy machinery or a six-figure contract. It needs approval, a sound layout and the people who ride here.
- This course
- About $420,000–$560,000 for roughly 7 miles of stages and climb
- Upkeep
- Builders advise budgeting about 5% of the build cost every year, or about $4,000 per mile
- This course
- About 3,700 volunteer hours. The cash cost is tools and materials.
- Labor value
- About $19,000 per mile donated to Emmitsburg, at $36.14 per volunteer hour
Course length is estimated from the proposed route. Costs and rates come from the sources on the last page.
Narrow, rock-armored singletrack of the kind volunteers build by hand. Shed Enduro 2026 · Photo: Anderson PhotographyWhy hand-built is the right call here
- 1It has been done, at scaleAt Rocky Point, Oregon, 84 volunteers logged 375 hours and built about half a mile of trail in one day. In Colorado, 574 volunteers built the Legacy Trail by hand over four years, saving about $124,000 in project costs.
- 2Steep ground favors hand workFederal trail research finds that grade, alignment, drainage and the amount of rock in the tread control soil loss. Hand crews can follow the contour closely and set rock into the steep pitches, where machines often cannot work.
- 3A narrower footprintRecreation-ecology guidance calls hand construction the least disruptive method. It keeps the tread narrow, and doubling a trail's width doubles the ground it disturbs.
- 4Built to last on technical terrainIMBA recommends natural rock and rock armoring for technical trails steeper than 15 percent. In Sedona, hand-built stonework holds up under nearly 3 million visits a year, where machinery is too destructive to use.
- 5It builds the community tooResearch on trail projects finds that volunteer trail work builds social connection, sense of place and community resilience. Trail groups that rely on outside money struggle to keep up maintenance when that money stops.
- 6The right tool for this trailMachines make sense for big jump lines. IMBA's own trail-building program says hand-built singletrack can be very affordable, and natural, technical singletrack is exactly what an enduro course needs.
The trade-off is time, since volunteer-built trails take longer. At Rocky Point's pace, roughly 14 large build days would cover the course, scheduled across the months before race weekend.
How the weekend runs
Enduro racing times the downhill stages and leaves the climbs between them untimed. The lowest total time across all stages wins.
Photo: Pisgah PaparazziPractice
Every stage opens for official practice so riders arrive on race day knowing the course.
Registration, vendors and bike checks run at the staging venue all day.
Photo: Anderson PhotographyRace day
Every category races five timed stages. The Pro/Elite field then races a sixth stage to decide the purse, with the podium to follow in town.
| Category | Who races |
|---|---|
| Pro/Elite Men | Prize purse · 6 stages |
| Pro/Elite Women | Prize purse · 6 stages |
| Expert | Men and women, age groups |
| Sport | Men and women, age groups |
| Beginner | Men and women |
| Junior | Youth riders |
Why it works here
- 1One course for everyoneAmateurs race the same stages as the pros, which is the main draw for an open field.
- 2Stages, not lapsRiders spread out across the mountain, so the trails carry the field without crowding.
- 3A town finishStaging and the podium in Emmitsburg put racers and spectators on Main Street, not just in the woods.
The course
One climb to the summit, then five descent stages down different sides of the mountain. Staging, pits and parking sit together at the trailhead.
- The climbShared transfer to the summit, ridden before every stage
- 1Stage 1West, outer line
- 2Stage 2West, inner switchbacks
- 3Stage 3Center-west
- 4Stage 4Center-east
- 5Stage 5East
- Untimed linksLow connectors back to the climb
- +AMP medicalBase at staging, summit post at the stage starts, road-access post on Hampton Valley Rd
- S/FStart, finish, pitsOne staging area at the trailhead
- PParkingBeside staging, off the road
Elevation profile
Why this mountain is an elite course
- 1Nearly 5,000 feet of climbing4,948 ft over 17.5 miles is about 280 ft of climbing for every mile. Five trips to the summit make fitness count on the transfers as well as on the stages.
- 2Real vertical on every stageEach descent drops roughly 700 to 1,000 ft from the summit. Stages that long open real time gaps, which is how a pro field gets sorted.
- 3Five different ways downThe stages leave the same summit and spread across the west, center and east sides of the mountain. Each one rides differently, so no rider wins on a single strength.
- 4The fatigue stacks upThe last stage begins after nearly all of the day's climbing. Riders who stay sharp across five full efforts win, which is the test an elite race should set.
- 5Compact and safe to runThe whole course fits in about 1.5 by 0.8 miles. One climb gives medical and radio crews a single corridor, and three AMP posts keep response distances short.
- 6One summit for spectators and mediaEvery stage starts at the same high point, so photographers, video and fans can catch every rider on every stage from one place.



Course traced from the proposed Strava route (17.55 mi, 4,948 ft gain). The line work is approximate, and the stage order is still to be confirmed.
Who we are
Two organizations, one crew. B-Team Productions runs the race. B-Team NP, a 501(c)(3), puts the mission behind it.
B-Team Productions
The event arm of B-Team Racing, an East Coast grassroots mountain-bike team. In 2024 we took over the Frederick Watershed's Sheduro, rebuilt it as The Shed Enduro, and grew it into one of the Mid-Atlantic's major enduro weekends.
- →Course design and race operationsStage layout, marking, timing, volunteers, registration and cleanup.
- →Safety partners already in placeEstablished working relationships with AMP for medical and the FARC ham radio team.
- →A field that travels269 registered racers in 2026, with the average annual field up from 186.5 to 238.5 rider entries since B-Team took over.
B-Team NP
“Advancing high-level community mountain biking through competition, stewardship, and athlete development.”
B-Team NP Corporation is a 501(c)(3) nonprofit, and The Shed Enduro is its flagship event.
- →Trail stewardshipHand-built and restored singletrack, including trail rehabilitation work in the Frederick Watershed.
- →Athlete developmentSupport for expert-level competition, rider progression and scholarships.
- →Safety infrastructurePursuing a portable professional timing and scoring system for Maryland races.
Start to finish
Phase 1: Permission and planning
Phase 2: Trail build
Phase 3: Partners and safety
Phase 4: Registration, purse and sponsors
Phase 5: Venue and logistics
Phase 6: Volunteers and run of show
Phase 7: Race weekend
Phase 8: After the race
Sources
Every outside figure in this pitch links to its source. Select any title to open it.
Trail building costs
Volunteer-built trails
Trail sustainability and steep terrain
Community and stewardship
B-Team data
- Shed Enduro registration data, 2018–2026, B-Team Productions (no event in 2020)
- Proposed course route, Strava (17.55 mi, 4,948 ft gain)
- Photography: Pisgah Paparazzi and Anderson Photography, The Shed Enduro 2026, Frederick Watershed